Electrical panel, trim around the windows, and a/c unit...

Trim around the bathroom window...

Tremendous progress has been made over the last week. We intentionally waited before posting this update so we could give you lots to look at. I will narrate the update as we move from room to room. I will let you know what progress has been made in each room and what is left to be completed. Let's start with the living room.
Living Room...
We have the air conditioning/heating unit installed as well as a programmable thermostat. All windows have been framed/painted and cleaned. Baseboards have been installed and painted. We have electrical outlets as well as light switches. We are still waiting on the door and air intake vent for the air/heating unit, ceiling fan, and carpet.

This cute light fixture will shine light on the table and it has a switch for it right below it.

You can really pick up the texture on the walls in this picture. They look really nice.

Kitchen...
The cabinets have been installed and are now stained. We have wallpaper on the north wall and a border on the south wall. Paneling, half way up, has been installed behind the washer/dryer. We have outlets, light switches, smoke detector, overhead light and baseboards. We still need tile, countertop, and plumbing.


We have a pantry door but still need shelves inside. The border is currently only on the south wall. We ran out of border and as soon as we receive more, we will continue it around the corner.

Do you notice that 2 of the cabinets, on either side of the window, do not have doors yet? Stained glass will be inserted into these doors.

Nice view from the bedroom doorway.

A closer look at the border.

Bedroom...
The windows have been cleaned and trim has been installed/painted. We have switches/ outlets and a smoke detector.


The baseboards have been installed/painted. We have a bedroom door as well as closet doors...

...and a bathroom door. We still need the ceiling fan and carpet.

The camera picked up alot of dust in the air. We had just finished sweeping the floors right before pictures.
Bathroom...
I personally think this room has made the most progress. We have a light fixture, fan, wallpaper, border, window trim...

...vanity, paneling, baseboards...

...water heater doors...

...linen cabinet...

...door, outlets, and light switch. We still need plumbing, tile, and wallpaper/border. We ran out of wallpaper and have ordered more. One wall has not been completed.
Doesn't everything look gorgeous!
"Please sign our guestbook."